Email Us
What's Your Best Price For This Product?

We will quote you the best price based on your order quantity. So pls advise the order quantity when you make an inquiry.

How Do We Control Moisture Content For Engineered Wood Flooring?

The moisture content of the engineered floor is normally 8+-2%, We use a moisture tester. We do moisture tests from the beginning to the end of production many times. When we are selecting veneers, after kiln dry, after gluing, and after coating before packing, we check the moisture all the time. And not only to the veneer but also to the plywood. Only if the veneer and plywood moisture has reached a certain value, we can start glue and cold press.

What Are Your Terms Of Packing?

Generally, we pack our goods in boxes with pallets. If you have your requirements, we can pack the goods in your branded boxes.

Can You Design For Us?

Yes, we have a professional team in the R&D department. Just tell us ideas, and we will help to carry out your plan into the design and follow with actual sampling.

Is Your Parquet Approved To Be Used On Concrete Floors With Floor Heating System In?

Yes, The engineered floor is all available for the heating system.

Can You Produce Goods According To The Samples Supplied Or Drawings By Customers?

Yes, we can produce goods according to your samples and drawings.

Is OEM Available?

Yes, it is. We are the OEM for 'Nature', the largest Chinese wood floor brand.

How About Your Delivery Time?

It will take 30 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Are FREE SAMPLES Available?

Yes, some of the samples are free, but the express delivery cost is to be collected and we will pay it back after confirming the order.

How Long Can I Expect To Get The Sample?

It usually takes 3-15 days to finish the samples. The sample delivery time would be from 3-5 workdays depends on the express company you choose.

What Is The PAYMENT TERMSI

T/T 30% in advance, 70% against documents.

What Is The LEAD TIME?

Normally 45days after down payment.

Do You Have MOQ

No, we don't.